Apply the first coat thinly along the wood grain with the Oil Finish Application Fleece supplied. Remove any excess TopOil with a clean, dry lint free cloth.
Allow to dry for approx. 8-10 hours. Ventilate well while drying.
Thinly apply the second coat with the Oil Finish Applicator Fleece. Avoid covering during drying and curing. After 2-3 weeks, the surface is fully cured.
For renovations, one coat applied to the clean and dry surface with an Oil Finish Applicator Fleece or lint-free cloth is usually sufficient.
Once the TopOil has fully cured, clean the newly oiled surface using the cleaning spray supplied as and when required.
The supplied abrasive pad can be used to help remove minor scratches, scuffs or dirt from waxed or oiled work surfaces prior to cleaning and renovation.